Power Barge I
For:
Odyssea Transportation, Inc., Houston, TX
Dates:
March 97 to December 99The scope
of the job work includes:
- Consult,
supervise contractors, and install systems during
the over-haul of a 30 Megawatt portable power
plant.
- Design,
write and test the PLC ladder logic, HMI
graphical interface software (Cimplicity), touch
screen panels and integrate the total
system.
- Test
the plant including the boiler controls, burner
management and alarm systems plus the mechanical
systems (feed-pumps, condensate, and circulation
systems) in the shipyard.
- We
are presently on site in Barahona, Dominican
Republic assisting the operations crew in setting
up the plant and performing plant maintenance.
SS Alpena
For:
Inland Lakes Management, Alpena, MI
Dates:
January 98 to April 98; January 99 to April 99
The scope
of the job was as follows:
- Provide
all equipment, services and labor to install 2
fully redundant PLC based burner management
systems including all installation, testing, ABS
and US Coast Guard approvals and all services
required for system to be fully operational.
- Design,
write and test the software for the new system.
- Maintain
and tune the combustion control system.
- Add
Main engine and reduction gear bearing
monitoring, Bell logger and new shaft speed
indicators. Reconfigured the combustion controls
to full metering. Add a graphical interface
display system for alarming and trending.
USS Rushmore
For:
Electronic Design, Inc.
Dates:
September 1997 to May 1998
The scope
of the job included the following:
- Remove
existing Main propulsion and ship service
generator control systems. Install new Allen
Bradley based PLC system for the Navy Smart ship
control system.
- Integrate
the new system into the new ship network
including the communications and LAN setup for
bridge control, main control room and damage
control systems.
- Design,
write and test the software for the new system.
S.S. Equality
State
For:
Interocean Ugland Management Corp.
Dates:
July 28,1997 to September 4, 1997
The scope
of the job included the following:
- Design
and build new boiler control console section for
ships boiler control controls and burner
management system.
- Obtain
U.S. Coast Guard approvals for new system.
- Design
and install new burner management system and
upgrade the existing combustion controls to a new
automatic system.
- Design,
write and test the software for the new system.
S.S. Diamond
State
For:
Interocean Ugland Management Corp.
Dates:
June 23,1997 to August 8, 1997
The scope
of the job included the following:
- Design
and build new boiler control console section for
ships boiler control controls and burner
management system.
- Obtain
U.S. Coast Guard approvals for new system.
- Design
and install new burner management system and
upgrade existing Combustion controls to a new
automatic system.
- Design,
write and test the software for the new system.
V.A.
Medical Center, Shreveport LA
For:
Veterans Administration
Dates:
June 22, 1998 to August 30, 1998
The scope
of the job included the following:
- Replace
the existing power plant combustion control and
burner management system with a new full
automatic full metering system with fully
automatic burner management on three boilers.
- Designed,
built and installed the console modification
sections.
- Commissioned